Eagle Sub Station, Tipton, West Midlands
60 YEARS
1964-2024
Eagle Sub Station, Tipton, West Midlands
The sub station has been completed while the original building was still in use. Utilizing the existing frame, the design and implementation was logistically important to coordinate with the switch over of the new supply to the site. The Kingspan composite cladding system utilized on all the other structures was again implemented on this structure to give symmetry
Project Gallery
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1413.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1682.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1770.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1798.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1894.jpg)
Get in Touch
K&M Engineering (Shropshire) Limited
Sarn Works
Halfway House
Shrewsbury
Shropshire
SY5 9DA
01743 884 340
© 2024 K&M Engineering (Shropshire) Limited - All Rights Reserved