Harry Tuffins Supermarket, Churchstoke.
60 YEARS
1964-2024
Harry Tuffins Supermarket, Churchstoke.
When K&M were awarded the contract to refurbish the 4000m² existing supermarket roof with a new composite roof panel, the client expressed a wish that the work be completed with as little disruption to the customers and the day to day running of the store. Logistically the area of work was restricted along with a limited timescale but the work was completed within the requirements of the client, which were met at all stages.
Project Gallery
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP0676.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP0756.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP0779.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP0785.jpg)
Get in Touch
K&M Engineering (Shropshire) Limited
Sarn Works
Halfway House
Shrewsbury
Shropshire
SY5 9DA
01743 884 340
© 2024 K&M Engineering (Shropshire) Limited - All Rights Reserved